ba45. Refit any shrouding removed earlier and close the cubicle doors.■ Connection procedure of the energy storage cablesMake sure that the converter and filter modules, and other components of the DC/DCconverter unit has been installed in a cabinet, in other words, the mechanical installationhas been done.Make also sure that the electrical connections between the components of the DC/DCconverter unit has been done.WARNING!Obey the safety instructions of the drive. If you ignore them, injury or death, ordamage to the equipment can occur.If you are not a qualified electrician, do not do installation or maintenance work.WARNING!Apply grease to stripped aluminum conductors before attaching them to non-coatedaluminum cable lugs. Obey the grease manufacturer’s instructions.Aluminum-aluminum contact can cause oxidation in the contact surfaces.1. Stop the drive and do the steps in section Electrical safety precautions (page 60) beforeyou start the work.2. Open the door of the DC/DC converter cubicle and remove the shrouding (if any).3. Lead the cables into the cubicle.4. Ground the cable shield 360 degrees at the cable entry. See the instructions by thecabinet installer. An example grounding arrangement is shown below.5. Cut the cables to suitable length. Strip the cables and conductors, and install the cablelugs at the end of the conductors.6. Connect the conductors to appropriate terminals. See the delivery-specific connectiondiagram of the cabinet-installed unit. For the tightening torques, see the technical data.7. Twist the cable shields into bundles and connect them to the protective grounding busbar(PE) of the cabinet.8. Refit any shrouding removed earlier and close the cubicle doors.Electrical installation 6511