ES601-US OPERATING MANUALES601pc-US Software/Chapter 8 # Page 158Figure 110 - Communications dialog.than the AC supply. In the Direct Method, the DUT is powered by the AC supply, and patient leakage isdetermined by connecting isolated patient leads to AC supply only (Type B non-isolated leads are nottested). For VDE0751 and IEC62353 standards, the "IEC60601 method" means the DUT is powered bythe AC supply and patient leakage is determined by connecting patient leads either to mains or to ground(Type B parts will be tested).The Alternate method of leakage measurement can only be used with Type FIsolated Leads.8.6.23 Test Point-to-Point (IEC61010)Clicking this check box enables measurement of Enclosure Leakage Current from one arbitrary point on theDUT enclosure to a second arbitrary point. The point-to-point enclosure connections are made via jacksAP1 and AP2 on ES601-US. This test is pertinent to the IEC61010 standard only.8.6.24 Uploading AutoSequencesTo upload Safety AutoSequences to ES601-US, press the “Upload To ES601" button. Choose eitheruploading via USB, Ethernet, or Serial Port, and then press "Connect". If the connection is via ethernet,enter the IP address assigned to ES601-US (the IP address of ES601-US is displayed on the LCD when theanalyzer is operating in Ethernet Mode). If the connection is via serial port, choose the COM port to whichthe ES601-US is connected (Figure 108).