- Chapter 1 Pre-planning tasks
- Before you begin
- VMAX All Flash packaging
- Chapter 2 Delivery and transportation
- Delivery arrangements
- Shipping and storage environmental requirements
- Chapter 3 Specifications
- Radio frequency interference
- Power consumption and heat dissipation
- Adaptive cooling
- Airflow
- Air volume, air quality, and temperature
- Air quality requirements
- Shock and vibration
- Hardware acclimation times
- Optical multimode cables
- Chapter 4 Data Center Safety and Remote Support
- Fire suppressant disclaimer
- Chapter 5 Physical weight and space
- Floor load-bearing capacity
- Physical space and weight
- Chapter 6 Position VMAX 250F Bay
- Bay layout and dimensions
- Tile placement
- Cabinet stabilizing
- Chapter 7 Position VMAX 450F, VMAX 850F, VMAX 950F Bays
- System bay layouts
- Adjacent layouts, VMAX 450F, VMAX 850F, VMAX 950F
- Dispersed layout, VMAX 450F, VMAX 850F, VMAX 950F
- Adjacent and dispersed (mixed) layout
- Dimensions for array layouts
- Caster and leveler dimensions
- Chapter 8 Power cabling, cords and connectors
- Power distribution equipment, VMAX 250F
- Power distribution unit VMAX 450F, VMAX 850F, VMAX 950F
- Wiring configurations, VMAX 250F
- Wiring configurations, VMAX 450F, VMAX 850F, VMAX 950F
- Power interface
- VMAX 250F customer AC power feed cabling
- Best practices: Power configuration guidelines
- Single-phase
- Three-phase (International (Wye))
- Three-phase (North American (Delta))
- Three-phase (Wye, Domestic)
- Chapter 9 EMC racking for VMAX 250F
- Two system configurations
- Chapter 10 Third Party Racking Option for VMAX 250F
- Computer room requirements, VMAX 250F
- PDU requirements for third party racks, VMAX 250F
- Power distribution equipment for third-party rack, VMAX 250F
- Chapter 11 Third Party Racking Option for VMAX 450F, VMAX 850F and VMAX 950F
- Computer room requirements
- Customer rack requirements
- Third party racks with vertical PDUs — RPQ Required
- Requirements for third party racks with vertical PDUs (rear-facing
- Requirements for third party racks with vertical PDUs (inward facing)
- Chassis to chassis grounding
- Chapter 12 Optional kits
- Overhead routing kit
- Dispersion kits, VMAX 950F
- Securing kits
- Appendix A Best Practices for AC Power Connections
- Best practices overview for AC power connections
- Selecting the proper AC power connection procedure
- Procedure A: Working with the customer's electrician onsite
- Procedure A, Task 1: Customer's electrician
- Procedure A, Task 2: EMC Customer Engineer
- Procedure A, Task 2: EMC Customer Engineer (VMAX 250F)
- Procedure A, Task 3: Customer's electrician
- Procedure B: Verify and connect
- Procedure C: Obtain customer verification
- Applying PDU labels, VMAX 250F
- Applying PDU labels, VMAX 450F, VMAX 850F, VMAX 950F
- AC power specifications
|
Selecting the proper AC power connection procedureThe EMC Customer Engineer must select the proper AC power connection procedureThere are three possible scenarios at the installation site regarding the connection ofcustomer AC power to the EMC array. The EMC Customer Engineer (CE) must selectthe proper AC power connection procedure for the scenario.1. Refer to table below which summarizes the three possible scenarios at theinstallation site when you are about to connect external AC power to the EMCarray.2. Select the procedure that applies to your situation and follow the instructions forthat procedure.Table 38 Procedure options for AC power connectionIf the scenario is... then use this procedure:The customer’s electrician is available at the installation site. Aa, See: Procedure A: Working with the customer's electricianonsite on page 114Access to customer-supplied, labeled, power cables (beneathraised floor or overhead).(And the customer’s electrician is NOT available at theinstallation site.)B, See: Procedure B: Verify and connect on page 125Customer-supplied PDU source cables are already pluggedinto the EMC PDU (or VMAX 250F PDP) and you have noaccess to the customer-supplied, labeled, power cables(beneath raised floor or overhead).(And the customer’s electrician is NOT available at theinstallation site.)C, See: Procedure C: Obtain customer verification on page126a. Procedure A assures fault tolerant power in the EMC array.Best Practices for AC Power ConnectionsSelecting the proper AC power connection procedure 113