Contents - Table Of Contents
- Table Of Contents
- Table Of Contents
- Figures
- Tables
- Preface
- Revision history
- Chapter 1 Pre-planning tasks
- Before you begin
- VMAX All Flash packaging
- Chapter 2 Delivery and transportation
- Delivery arrangements
- Shipping and storage environmental requirements
- Chapter 3 Specifications
- Radio frequency interference
- Power consumption and heat dissipation
- Adaptive cooling
- Airflow
- Air volume, air quality, and temperature
- Air quality requirements
- Shock and vibration
- Hardware acclimation times
- Optical multimode cables
- Chapter 4 Data Center Safety and Remote Support
- Fire suppressant disclaimer
- Chapter 5 Physical weight and space
- Floor load-bearing capacity
- Physical space and weight
- Chapter 6 Position VMAX 250F Bay
- Bay layout and dimensions
- Tile placement
- Cabinet stabilizing
- Chapter 7 Position VMAX 450F, VMAX 850F, VMAX 950F Bays
- System bay layouts
- Adjacent layouts, VMAX 450F, VMAX 850F, VMAX 950F
- Dispersed layout, VMAX 450F, VMAX 850F, VMAX 950F
- Adjacent and dispersed (mixed) layout
- Dimensions for array layouts
- Caster and leveler dimensions
- Chapter 8 Power cabling, cords and connectors
- Power distribution equipment, VMAX 250F
- Power distribution unit VMAX 450F, VMAX 850F, VMAX 950F
- Wiring configurations, VMAX 250F
- Wiring configurations, VMAX 450F, VMAX 850F, VMAX 950F
- Power interface
- VMAX 250F customer AC power feed cabling
- Best practices: Power configuration guidelines
- Single-phase
- Three-phase (International (Wye))
- Three-phase (North American (Delta))
- Three-phase (Wye, Domestic)
- Chapter 9 EMC racking for VMAX 250F
- Two system configurations
- Chapter 10 Third Party Racking Option for VMAX 250F
- Computer room requirements, VMAX 250F
- PDU requirements for third party racks, VMAX 250F
- Power distribution equipment for third-party rack, VMAX 250F
- Chapter 11 Third Party Racking Option for VMAX 450F, VMAX 850F and VMAX 950F
- Computer room requirements
- Customer rack requirements
- Third party racks with vertical PDUs — RPQ Required
- Requirements for third party racks with vertical PDUs (rear-facing
- Requirements for third party racks with vertical PDUs (inward facing)
- Chassis to chassis grounding
- Chapter 12 Optional kits
- Overhead routing kit
- Dispersion kits, VMAX 950F
- Securing kits
- Appendix A Best Practices for AC Power Connections
- Best practices overview for AC power connections
- Selecting the proper AC power connection procedure
- Procedure A: Working with the customer's electrician onsite
- Procedure A, Task 1: Customer's electrician
- Procedure A, Task 2: EMC Customer Engineer
- Procedure A, Task 2: EMC Customer Engineer (VMAX 250F)
- Procedure A, Task 3: Customer's electrician
- Procedure B: Verify and connect
- Procedure C: Obtain customer verification
- Applying PDU labels, VMAX 250F
- Applying PDU labels, VMAX 450F, VMAX 850F, VMAX 950F
- AC power specifications
|
Before you beginVMAX All Flash arrays are designed for installation in data centers that provide:l Sufficient physical spacel Controlled temperature and humidityl Airflow and ventilationl Power and groundingl System cable routing facilitiesl Fire protectionRaised floors are preferred.For information regarding overhead cable routing, see: Overhead routing kit on page106.To prepare the site for an array, meet with your EMC Systems Engineer and EMCCustomer Engineer and determine what is needed to prepare for delivery andinstallation.One or more sessions may be necessary to finalize installation plans.Tasks to reviewThe following table provides a list of tasks to review during the planning process:Table 3 Before you beginTask Comments and/or ProvideIdentify power requirements with customer and customerelectrician.External AC power must be supplied from an independentcustomer-supplied power distribution unit (PDU).EMC recommends that the customer’s electrician be availableat the installation site for regular and third party rackedarrays.Best Practices for AC Power Connections on page 111provides details.For customer-supplied third party rack support, see thedetailed physical requirements in Third Party Racking Optionfor VMAX 250F on page 89 and Third Party Racking Optionfor VMAX 450F, VMAX 850F and VMAX 950F on page 95.The field representative working the order must:l Review the requisite information regarding the third partyracking option.l In Sizer, select the desired configuration. In theHardware Options screen, under Rack Type, selectThird Party.Complete theInstallation Planning Task Sheet and PresiteSurvey in DXCX.l Connection for ConnectEMC to dial home to the EMCSupport Center. Data Center Safety and Remote Supporton page 35 provides additional details on remotesupport.Pre-planning tasks16 Site Planning Guide VMAX 250F, VMAX 450F, VMAX 850F, VMAX 950F with HYPERMAX OS
PreviousNext |