Contents - Table Of Contents
- Table Of Contents
- Table Of Contents
- Figures
- Tables
- Preface
- Revision history
- Chapter 1 Pre-planning tasks
- Before you begin
- VMAX All Flash packaging
- Chapter 2 Delivery and transportation
- Delivery arrangements
- Shipping and storage environmental requirements
- Chapter 3 Specifications
- Radio frequency interference
- Power consumption and heat dissipation
- Adaptive cooling
- Airflow
- Air volume, air quality, and temperature
- Air quality requirements
- Shock and vibration
- Hardware acclimation times
- Optical multimode cables
- Chapter 4 Data Center Safety and Remote Support
- Fire suppressant disclaimer
- Chapter 5 Physical weight and space
- Floor load-bearing capacity
- Physical space and weight
- Chapter 6 Position VMAX 250F Bay
- Bay layout and dimensions
- Tile placement
- Cabinet stabilizing
- Chapter 7 Position VMAX 450F, VMAX 850F, VMAX 950F Bays
- System bay layouts
- Adjacent layouts, VMAX 450F, VMAX 850F, VMAX 950F
- Dispersed layout, VMAX 450F, VMAX 850F, VMAX 950F
- Adjacent and dispersed (mixed) layout
- Dimensions for array layouts
- Caster and leveler dimensions
- Chapter 8 Power cabling, cords and connectors
- Power distribution equipment, VMAX 250F
- Power distribution unit VMAX 450F, VMAX 850F, VMAX 950F
- Wiring configurations, VMAX 250F
- Wiring configurations, VMAX 450F, VMAX 850F, VMAX 950F
- Power interface
- VMAX 250F customer AC power feed cabling
- Best practices: Power configuration guidelines
- Single-phase
- Three-phase (International (Wye))
- Three-phase (North American (Delta))
- Three-phase (Wye, Domestic)
- Chapter 9 EMC racking for VMAX 250F
- Two system configurations
- Chapter 10 Third Party Racking Option for VMAX 250F
- Computer room requirements, VMAX 250F
- PDU requirements for third party racks, VMAX 250F
- Power distribution equipment for third-party rack, VMAX 250F
- Chapter 11 Third Party Racking Option for VMAX 450F, VMAX 850F and VMAX 950F
- Computer room requirements
- Customer rack requirements
- Third party racks with vertical PDUs — RPQ Required
- Requirements for third party racks with vertical PDUs (rear-facing
- Requirements for third party racks with vertical PDUs (inward facing)
- Chassis to chassis grounding
- Chapter 12 Optional kits
- Overhead routing kit
- Dispersion kits, VMAX 950F
- Securing kits
- Appendix A Best Practices for AC Power Connections
- Best practices overview for AC power connections
- Selecting the proper AC power connection procedure
- Procedure A: Working with the customer's electrician onsite
- Procedure A, Task 1: Customer's electrician
- Procedure A, Task 2: EMC Customer Engineer
- Procedure A, Task 2: EMC Customer Engineer (VMAX 250F)
- Procedure A, Task 3: Customer's electrician
- Procedure B: Verify and connect
- Procedure C: Obtain customer verification
- Applying PDU labels, VMAX 250F
- Applying PDU labels, VMAX 450F, VMAX 850F, VMAX 950F
- AC power specifications
|
Procedure B: Verify and connectPerform this procedure if the two conditions listed below are true:l Access to customer-supplied, labeled, power cables (beneath raised floor oroverhead).l The customer's electrician is not available at the installation site.This procedure requires the EMC Customer Engineer to verify that the customer'selectrician has complied with power specifications. Once verified, the EMC CustomerEngineer makes the required power connections overhead or under the floor.Procedure1. Have the customer verify that their electrician has complied with powerspecifications for voltage levels and redundancy. If the customer cannot verifythis, provide them with a copy of Procedure A. Inform the customer that theirarray may prematurely shut down in the event of a site power issue.2. Access the labeled, power cables (beneath raised floor or overhead) to verifythat the customer-supplied power cables are properly labeled as shown inFigure 36 on page 115 and described in Procedure A, Task 2.3. Compare the numbers on the customer-supplied power cables for each EMCbay to verify that power zone A and power zone B are powered by a differentcustomer-supplied PDU.4. If power extension cables are required, connect them to power zone A andpower zone B in each bay.5. Connect the customer-supplied power cables to EMC power zones as describedin Procedure A, Task 2.6. Record the customer-supplied PDU information as described in Procedure A,Task 2.7. Label the PDUs as described in PDU labels on page 126.Best Practices for AC Power ConnectionsProcedure B: Verify and connect 125
PreviousNext |