INSTALLATIONEaton® 9130 UPS (700–3000 VA) User's Guide 164201718 Rev 3 www.eaton.com/powerquality 212. Select the proper holes in the rack for positioning the UPS in therack (see Figure 5). The rails occupy four positions on the front andrear of the rack.3. Secure one rail assembly to the front of the rack with oneM616 pan-head screw and one M6 cage nut.4. Using two M6 cage nuts and two M616 pan-head screws, attachthe rail assembly to the rear of the rack.M616 Pan-HeadScrews (6 places)Front of RackM6 Cage Nuts(6 places)Tightenadjustmentscrews after rail attachment(3 places each rail).Position 4Position 1Figure 5. Securing the Rails5. Repeat Steps 3 and 4 for the other rail assembly.6. Tighten the three adjustment screws in the middle of each railassembly.7. If installing optional cabinets, repeat Step 1 through Step 6 for eachrail kit.8. Place the UPS on a flat, stable surface with the front of the cabinetfacing you.9. Align the mounting brackets with the screw holes on each side ofthe UPS and secure with the supplied M48 flat-head screws (seeFigure 6).