INSTALLATIONEaton® 9130 UPS (700–3000 VA) User's Guide 164201718 Rev 3 www.eaton.com/powerquality22NOTE There are two sets of four mounting holes on each side of the UPS: a forwardposition and a middle position. Choose the position that meets your configuration needs.MountingBracketM48 Flat-HeadScrews (4 places)Figure 6. Installing the Mounting Brackets (Forward Position Shown)10. If installing optional cabinets, repeat Steps 8 and 9 for each cabinet.11. Slide the UPS and any optional cabinets into the rack.12. Secure the front of the UPS to the rack using two M616 pan-headscrews and two M6 cage nuts on each side (see Figure 7). Installthe bottom screw on each side through the bottom hole of themounting bracket and the bottom hole of the rail.Repeat for any optional cabinets.M616 Pan-HeadScrews (4 places)M6 Cage Nuts(4 places)Figure 7. Securing the Front of the Cabinet