Rating Heat rejection(BTU/h x 1,000)Heat rejection[kW]120 kW 17.18 5.0150 kW 21.48 6.3160 kW 22.91 6.7200 kW 28.64 8.4Table 8: Air conditioning or ventilation requirements during full load operation, units withinternal transformersRating Heat rejection(BTU/h x 1,000)Heat rejection[kW]30 kW, with 1 internal trans-former8.2 2.440 kW, with 1 internal trans-former10.6 3.150 kW, with 1 internal trans-former13.3 3.930 kW, with 2 internal trans-formers11.9 3.540 kW, with 2 internal trans-formers15.7 4.650 kW, with 2 internal trans-formers19.8 5.880 kW, with 1 internal trans-former21.5 6.3100 kW, with 1 internaltransformer26.6 7.84.3.2 UPS system power wiring preparationsNote: If you are installing a maintenance bypass, provide one of these:- a minimum of 2 separate feeds with upstream feeder breakers- a single feed with 2 upstream feeder breakers: one for the UPS or rectifierinput breaker (if installed) and one for the maintenance bypass input.Do not use a single feed or a single feeder breaker to supply both- the UPS or rectifier input breaker- the maintenance bypass.If you install a bypass input breaker in the maintenance bypass on a single-feed UPS, a single feed to the maintenance bypass is acceptable forsupplying both the UPS and the bypass.Eaton 9PHD UPS 30–200 kW User's and installation guide© Eaton Corporation plc 2017. All rights reserved. Document ID: P-164000531 49 (127)