9710 Maintenance / CheckingMounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de10 Maintenance / Checking10.1 Safety NotesWARNING! RISK OF INJURY!Improper maintenance work can cause serious per-sonal injury and / or material damage This work hasto be performed only by authorised, skilled and ade-quate personnel who have received instructions pro-viding information on the device and in observance oflocal safety regulationsOO Before working on and with the system switch it offand protect it against reset.OO Do not touch the system unti its temperature is as highas the ambient temperature.10.2 General information to maintenance /checkingThe carrying out of the safety inspections as requiredby statutes and directives has to be made regularly. Theoperator of the emergency lighting system is responsiblefor organising and supervising this work!The following information must be specified in writing andmade available at all times :OO The nature and extent of the workOO Recording of work resultsOO Responsibilities and permits for carrying out the workOO which persons may carry out which operations?OO which persons are responsible for supervising thework?OO Duties of reporting (e. g. in the case of faults orfunction tests)OO Organisational measures when working on theemergency lighting system. This may include:OO Duties of information and reporting on the start,duration and end of the workOO Safety measures while the work is being carriedout: e. g. standby lighting, power supply isolationand lock-out (e. g. removing the fuses, key-operatedswitch, safety signage)OO Safety equipment for the personnel carrying out thework on the plant (e. g. suitable work clothing andpersonal protection equipment)OO Safety equipment providing protection from hazardscaused by adjacent plant (e. g. safety grilles, barriers,making safe or roads)Maintenance and repair work at the emergency lightingsystem can be done by the customer service of CEAGNotlichtsysteme GmbH at any time. (s. enclosedCustomer Service Order).Our customer service locations can be found all overGermany, see the enclosed map „Addresses: CEAGCustomer Service“.In addition, we offer you a Maintenance Contract forEmergency Lighting making organisation easier to you!This contract contains the annual checking and includesthe following work:OO Mains/-battery shift-function of devicesOO Visual check of electrical equipment and batteries ofdevicesOO Mechanical check at the devicesOO Checking of charging rateOO Measurement of battery voltage at loadcommencement and measurement of the cell voltageOO Operational test of other electronicsOO Checking of lamps only for luminaires withCG-monitoringOO Checking of rated operation time (test of capacity) ofthe batteriesNot included in maintenance services is repair andoverhaul work, in particular the replacement of defectiveelectronics or defective light sources.NOTEIn case of returns you need a RMA - number from us.For further information see www.ceag.de!