13GREEN MOTION DC 44/66 EV CHARGER INSTALLATION MANUAL MN192006EN March 2023 www.eaton.com00TitleFigure 6. Lifting instruction for the EV chargerDo not underestimate the weight of the Green Motion DC 44/66 EV charger. Check the technicalspecifications.Manpower for transportation, handling and lifting must be considered due to the weight of the unit inaccordance with the requirements of local regulations.Do not move or stop the hanging load above people or things.Do not let it drop with too much force.Please refer to local regulations and laws for lifting of the equipment.Do not lift multiple units or parts of the equipment at the same time, unless otherwise stated.The Green Motion DC 44/66 EV charger is not equipped with specific lifting tools.The unit should be lifted with the sling loops through the lifting eyelet.Once the product is fixed to the floor, replace the eyelets with the M12 screws supplied.The screen and the housing should be protected during the operation to avoid damage and paint scratches.