35GREEN MOTION DC 44/66 EV CHARGER INSTALLATION MANUAL MN192006EN March 2023 www.eaton.com00TitleFollow the steps below to replace the filters:Step 1. Open the housing by unlocking the cam locks as described in Chapter 8.1.Step 2. The filters are located on both left and right sides of the unit, behind the air flow grids. Using a 2.5 mm hexkey, remove the 2 screws attaching each filter cartridge to the unit.See Figure 24.Figure 24. Location of the filter on the left side of the unitStep 3. Screw the new filters on the back of the air flow grid.Step 4. Close the front cover and restart the unit.8.5 DismountStep 1. Disconnect any load if present.Step 2. Open the housing by unlocking the cam locks as described in Chapter 8.1.Step 3. Disconnect the EV charger from the AC GRID (see Figure 14)Step 4. Disconnect the communication cables and external controls where present.Step 5. The product can now be removed for disposal or repair.Before starting any maintenance operations, ensure the system has been switched off, and that the AC-lineexternal main switch has been set to off. Disconnect the unit from the power supply and wait at least10 minutes to allow its components to cool down and any static electricity storage devices to discharge,before removing the unit. The housing could be heated by direct sunlight and it can cause burns by contact.Please use suitable PPE or wait for the equipment to cool down before accessing it.To uninstall the unit: