InsulGard System Installation and Start Up Guideline162) Diagram of the main required connections to InsulgardFigure 1-13 Main connection to InsulGard3) IPDS sensors installation specificsa) Be sure to install the capacitors on the HV Phase leads and not on the neutral side of the winding.b) If a motor has surge capacitors, install the HV connection on the motor winding side of the surge capacitors.See diagrams below.InsulGard EnclosureNEMA 4Note:Mount close to a motor mainterminal box and RTDtermination box to minimizecable and conduits length120 (230) VAC10 ampPower Source1 - 2 conductor, twisted pair 22 AWG for RS485 Networkand/or 1- 2 conductor phone wire for modem remotecommunications, if required.1 - 2 conductor shielded wire for 4 - 20 ma output, if required1 - 6 conductor cable suitable monitoring of dry contacts forsystem status, low alarm and high alarm (minimum 2conductors if contacts are connected in series or in parallel)1" conduitfitting1 1/2"conduitfittingMotor terminal box3 coax cables from couplingcapacitors1 - 3 wire shielded cableAWG22 for Humidity sensor(comes with the sensor)1 - 2 wire shielded cableAWG22 for Load sensor(comes with the sensor)1 - 3 wire shielded cableAWG22 for the Temperaturesensor (if provided, comeswith the sensor)RTD terminal box1 coax cable per RTDfrom RTD PD sensor(s)1 - 3 wire shielded cableAWG22 for winding RTD(if provided)MotorWindingCouplingCapSurgeCapIncomingPowerRightMotorWindingIncomingPowerCouplingCapSurgeCapWrongMotorWindingCouplingCapSurgeCapIncomingPowerWrong