EATON Power Distribution Rack (208V) User’s Guide 164201720 Rev 1 www.powerware.com 7Chapter 3 InstallationThis section explains: Equipment inspection Tools required Planning the cabinet location Unpacking the cabinet and checking the accessory kit Preparing and moving the cabinet to its final location Installation and wiring Initial startup Completing the installation checklistInspecting the EquipmentIf any equipment has been damaged during shipment, keep the shipping cartons andpacking materials for the carrier or place of purchase and file a claim for shippingdamage. If you discover damage after acceptance, file a claim for concealed damage.To file a claim for shipping damage or concealed damage: 1) File with the carrierwithin 15 days of receipt of the equipment; 2) Send a copy of the damage claimwithin 15 days to your service representative.Tools RequiredTo assemble the components, the following tools may be needed: #1 and #2 slotted screwdrivers M10, M13, and 5/16" socket wrenches 14 mm socket and socket wrench 5/16" Allen wrench 3/4" and 1−1/8" open−end wrenches Step ladder, for ease of access to the top of the cabinet Configurations with side breakers. 10 mm socket and socket wrench Quad−Feed Input, Single 800A Main Input Lug, and Dual 800A Main Input Lugconfigurations. Crimping tools recommended in Table 2 on page 19.