INSTALLATIONEATON Power Distribution Rack (208V) User’s Guide 164201720 Rev 1 www.powerware.com34Completing the Installation ChecklistThe final step in installing the PDR is completing the following Installation Checklist.This checklist ensures that you have completely installed all hardware, cables, andother equipment. Complete all items listed on the checklist to help ensure a smoothinstallation. Make a copy of the checklist before filling it out, and retain the original.NOTE The installation checklist MUST be completed prior to starting the PDR for the first time.Installation Checklist All packing materials and restraints have been removed. The PDR is placed in its installed location and all doors, interior barriers, and sidepanels are installed and secure. All conduits and cables are properly routed to the PDR. All power cables are properly sized and terminated. Branch circuit breakers are installed and wired to load. Input power connections are properly installed, including ground conductors. Ground jumper between cabinet and interior barrier is properly installed. Neutral conductors are installed or bonded to ground. Quad−Feed Input, Single 800A Main Input Lug, and Dual 800A Main Input Lugconfigurations. Busbar shield or shields in the interior top of the cabinet areproperly installed. No foreign objects are inside the cabinet. LAN and telephone drops are installed, and LAN and telephone connections havebeen completed. (Optional) The area around the installed PDR is clean and dust-free. (The PDR must beinstalled on a level floor suitable for computer or electronic equipment.) Adequate workspace exists around the PDR. Adequate lighting is provided around the PDR.