39InStALLAtIon And opErAtIon mAnuAL 25-13741-E January 2020 www.eaton.com11. Commissioning11. CommissioningThe system should be commissioned by a competent person, trained by Eaton.The person should possess a basic knowledge and understanding of Section 2 andSection 3 of the BS 5839-9: 2011 standard.11.1 Wiring checkCable readings should be recorded. Consult local regulations.On completion of the wiring, or sections of the wiring, the installer should carry outtests to ensure the integrity of cable insulation and adequate earth connections.These tests must to be carried out with the equipment disconnected,and prior to completion of the entire installation.ote:n Ensure connections do not become loose while mounting units.ote:n Label the cables, where ever possible.