9InStALLAtIon And opErAtIon mAnuAL 25-13741-E January 2020 www.eaton.com6. Receipt/unpacking6. Receipt/unpackingOn receiving the unit, verify that the catalog number and unit options stated onthe shipping container match those stated on the order/purchase form. Inspect theequipment upon delivery. Report any crate or carton damage to the carrier prior toaccepting the delivery, and have this information noted on the freight bill.Remove all packing material from the unit. Check the unit for any signs of shippingdamage. If damage is found after unpacking, report it to the Freight Company andEATON. Retain the packaging materials for the carrier to review.StorageIt is recommended that the unit should be stored in its original shipping box/crateuntil it is to be installed. The unit should be stored in a location where:• The ambient temperature is -5ºC to 40ºC• The relative humidity is 0% to 95%, non-condensing• The environment is dry, clean and non-corrosive• The unit will not be subjected to high shock or vibration conditionsote:n Refer to Appendix 1 for package content checklistote:n Batteries are not supplied with the unit and should be procured separately.