40 InStALLAtIon And opErAtIon mAnuAL 25-13741-E January 2020 www.eaton.com11. Commissioning11.2 Configuration stepspowering up the systemPower On:1. Before Power On, ensure all wiring connections arecorrect and have been checked.2. Power up the system using mains power supply.Verify below LEDs are on (Refer Figure 43):a. AC Powerb. Powerc. System Healthote:n The system will not power on directly from the battery. In the event of mainsfailure, the system will shift to battery power to continue smooth operation.Figure 37. Visual indications on panel1 3 4 5 6 7 81 3 4 5 6 7 8 10 11 12 13 14 15 1610 11 12 13 14 15 1622 99General FaultNetwork FaultPower Supply FaultSystem HealthCall IndicationDC-PowerAC-PowerPowerSystem FaultPanel FaultCall - OutstationFault - Outstation