ENGLISH• •Description of parts:FIG. 011 Main switch2 Hot water/brew switch (pump)3 On/off light4 Steam switch (temperature)5 Correct temperature light6 Removable water tank7 Steam/hot water knob8 Turbo frother steam nozzle (removeable)9 Filterholder10 1 cup filter11 2 cup filter12 Basin (removable)13 “Perfect cream” Filter (OPTION)14 Brewing head15 Filterholder gasket16 Filter for pods17 Shower disc18 Tamper19 Power cable and plug20 Measuring spoon21 Delivery spout22 Tank cover23 Grid (removable)24 Cappuccino maker kit (OPTION)25 Overflowing protection holeInstructions for the power supply cordA A short power-supply cord is provided to reduce risks ofgetting tangled up or tripping over a longer cord.B Longer extension cords are available and may be used ifcare is exercised in their use.C If a long extension cord is used:1 the marked electrical rating of the extension cordshould be at least as great as the electrical rating ofthe appliance.2 if the appliance is of the grounded type, the extensioncord should be a grounding type3 the cable does not hang from the table to avoid therisk of getting caught up in it.Preparation:1. Remove the water tank cover (22) and fill the tank withcold water checking the level through the tank windowshown in FIG. 02.N.B.: The upper section of the tank (6) is provided with anoverflowing safety hole (25) in case of tank overfilling.The water tank can also be removed (FIG.02), afterremoving the tank cover (22).Re-install tank with water and cover (22).2. Insert plug (19) into a suitable wall outlet (see point 1under “Caution”).3. Press the main switch (1), the start light (3) will lightup.The temperature light (5) will light up fixed when therequired temperature is reached;Starting upThis procedure fills the water boiler with fresh water.This should be done whenever the machine is switched on.This machine, featuring a pump to brew coffee, is equippedwith a self-priming system.Place an empty cup under the brewing head (14), do notinsert the filter holder and press the hot water/coffee switch(2) (“1 Pos.).You will hear the sound of the operating pump, and aftera few seconds, water will start flowing out of the brewinghead (14).Warning! Before removing the water tank,make sure that the machine is off as not todamage the self-primer.