Contents - April
- safety rules
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- specifications
- Machine Component Weights
- Performance Specifications
- Hydraulic Component Specifications
- machine torque specifications
- Hydraulic Hose and Fitting Torque Specifications
- Torque Procedure
- Scheduled Maintenance Procedures
- Pre-Delivery Preparation Report
- maintenance inspection report
- Checklist A Procedures
- A-2 Perform Pre-operation Inspection
- A-4 Perform 30 Day Service
- A-6 Replace the Drive Hub Oil
- Checklist B Procedures
- B-2 Inspect the Electrical Wiring
- B-3 Inspect the Tires, Wheels and Lug Nut Torque
- B-4 Confirm the Proper Brake Configuration
- B-6 Test the Ground Control Override
- B-8 Test the Drive Brakes
- B-10 Test the Drive Speed - Raised or Extended Position
- B-11 Test the Alarm Package (if equipped)
- B-12 Test the Turntable Rotation Stop
- B-14 Perform Hydraulic Oil Analysis
- Checklist C Procedures
- Checklist D Procedures
- D-2 Check the Free-wheel Configuration
- D-3 Check the Turntable Rotation Bearing Bolts
- D-4 Replace the Drive Hub Oil
- D-6 Inspect for Turntable Bearing Wear
- Checklist E Procedures
- E-2 Grease the Steer Axle Wheel Bearings
- repair procedures
- platform controls
- platform components
- platform rotator
- platform overload system
- jib boom
- Jib Boom Bell Crank (models without rotating jib boom)
- jib boom lift cylinder
- primary boom components
- Primary Boom
- How to Disassemble the Primary Boom
- primary boom lift cylinder
- boom extension cylinder
- Platform Leveling Master Cylinder
- secondary boom components
- Secondary Boom
- secondary boom lift cylinder
- hydraulic pump
- function manifold components
- Valve Adjustments - Function Manifold
- How to Adjust the Secondary Boom Down Relief Valve
- How to Adjust the Turntable Rotate Relief Valve
- Jib Boom and Platform / Jib Boom Rotate Manifold Components
- valve coils
- How to Test a Coil Diode
- turntable rotation components
- Steer Axle Components
- Non-steer Axle Components
- fault codes
- Fault Code Charts
- Section 6 Schematics
- Electrical Symbol Legend
- hydraulic symbols legend
- limit switch location legend
- Power Cable Wiring Diagram
- Drive Contactor Panel Wiring Diagram
- Manifold and Limit Switch Wiring Diagram
- LVI/BCI Option Wiring Diagram
- Work and Drive Lights Option
- CTE Option, (CE Models)
- Charger Interlock Option
- Hydraulic Schematics
- hydraulic schematic
- Ground Control Box Terminal Strip Wiring Diagram, (ANSI / CSA / AS), (before serial numbers Z3010-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA / AS), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA / AS), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Terminal Strip Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Z34N14-10983 and Z3414-9685
|
April 2016 Service ManualChecklist B ProceduresPart No. 139378 Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N 27B-6Test the Ground Control OverrideGenie specifications require that this procedure beperformed every 250 hours or quarterly, whichevercomes first.A properly functioning ground control override isessential to safe machine operation. The groundcontrol override function is intended to allowground personnel to operate the machine from theground controls whether or not the EmergencyStop button on the platform controls is in the on oroff position. This function is particularly useful if theoperator at the platform controls cannot return theboom to the stowed position.1 Push in the red Emergency Stop button at theplatform controls to the off position.2 Turn the key switch to ground controls and pullout the red Emergency Stop button to the onposition.3 Operate each boom function through a partialcycle at the ground controls.Result: All boom functions should operate.B-7Test the Platform Self-levelingNote: Genie specifications require that thisprocedure be performed every 250 hours orquarterly, whichever comes first.Automatic platform self-leveling throughout the fullcycle of boom raising and lowering is essential forsafe machine operation. The platform is maintainedlevel by the platform leveling slave cylinder which iscontrolled by the platform leveling master cylinderlocated at the base of the primary boom. A platformself-leveling failure creates an unsafe workingcondition for platform and ground personnel.1 Turn the key switch to ground controls and pullout the red Emergency Stop button to the onposition at both the ground and platformcontrols.2 Lower the boom to the stowed position.3 Adjust the platform to a level position using theplatform leveling toggle switch.4 Raise and lower the primary boom through afull cycle.Result: The platform should remain level at alltimes to within ±5 degrees.
PreviousNext |