Contents - April
- safety rules
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- specifications
- Machine Component Weights
- Performance Specifications
- Hydraulic Component Specifications
- machine torque specifications
- Hydraulic Hose and Fitting Torque Specifications
- Torque Procedure
- Scheduled Maintenance Procedures
- Pre-Delivery Preparation Report
- maintenance inspection report
- Checklist A Procedures
- A-2 Perform Pre-operation Inspection
- A-4 Perform 30 Day Service
- A-6 Replace the Drive Hub Oil
- Checklist B Procedures
- B-2 Inspect the Electrical Wiring
- B-3 Inspect the Tires, Wheels and Lug Nut Torque
- B-4 Confirm the Proper Brake Configuration
- B-6 Test the Ground Control Override
- B-8 Test the Drive Brakes
- B-10 Test the Drive Speed - Raised or Extended Position
- B-11 Test the Alarm Package (if equipped)
- B-12 Test the Turntable Rotation Stop
- B-14 Perform Hydraulic Oil Analysis
- Checklist C Procedures
- Checklist D Procedures
- D-2 Check the Free-wheel Configuration
- D-3 Check the Turntable Rotation Bearing Bolts
- D-4 Replace the Drive Hub Oil
- D-6 Inspect for Turntable Bearing Wear
- Checklist E Procedures
- E-2 Grease the Steer Axle Wheel Bearings
- repair procedures
- platform controls
- platform components
- platform rotator
- platform overload system
- jib boom
- Jib Boom Bell Crank (models without rotating jib boom)
- jib boom lift cylinder
- primary boom components
- Primary Boom
- How to Disassemble the Primary Boom
- primary boom lift cylinder
- boom extension cylinder
- Platform Leveling Master Cylinder
- secondary boom components
- Secondary Boom
- secondary boom lift cylinder
- hydraulic pump
- function manifold components
- Valve Adjustments - Function Manifold
- How to Adjust the Secondary Boom Down Relief Valve
- How to Adjust the Turntable Rotate Relief Valve
- Jib Boom and Platform / Jib Boom Rotate Manifold Components
- valve coils
- How to Test a Coil Diode
- turntable rotation components
- Steer Axle Components
- Non-steer Axle Components
- fault codes
- Fault Code Charts
- Section 6 Schematics
- Electrical Symbol Legend
- hydraulic symbols legend
- limit switch location legend
- Power Cable Wiring Diagram
- Drive Contactor Panel Wiring Diagram
- Manifold and Limit Switch Wiring Diagram
- LVI/BCI Option Wiring Diagram
- Work and Drive Lights Option
- CTE Option, (CE Models)
- Charger Interlock Option
- Hydraulic Schematics
- hydraulic schematic
- Ground Control Box Terminal Strip Wiring Diagram, (ANSI / CSA / AS), (before serial numbers Z3010-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA / AS), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA / AS), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Terminal Strip Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Z34N14-10983 and Z3414-9685
|
April 2016Table of Contentsviii Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N Part No. 139378Introduction Introduction .......................................................................................................... iiImportant Information ..............................................................................................iiFind a Manual for this Model...................................................................................iiRevision History ..................................................................................................... iiiSerial Number Legend ........................................................................................... vSection 1 Safety Rules......................................................................................................... viGeneral Safety Rules .............................................................................................viSection 2 Specifications ....................................................................................................... 1Machine Specifications .......................................................................................... 1Machine Component Weights ................................................................................ 2Performance Specifications ................................................................................... 3Hydraulic Specification ........................................................................................... 4Hydraulic Component Specifications ..................................................................... 7Manifold Component Specifications....................................................................... 7Machine Torque Specifications .............................................................................. 8Hydraulic Hose and Fitting Torque Specifications ................................................. 9Torque Procedure ................................................................................................ 10SAE and Metric Fasteners Torque Charts ........................................................... 12Section 3 Scheduled Maintenance Procedures ............................................................... 13Introduction .......................................................................................................... 13Pre-Delivery Preparation Report .......................................................................... 16Maintenance Inspection Report ........................................................................... 18Checklist A Procedures ..................................................................................... 19A-1 Inspect the Manuals and Decals ................................................................... 19A-2 Perform Pre-operation Inspection ................................................................. 20A-3 Perform Function Tests ................................................................................. 20A-4 Perform 30 Day Service ................................................................................ 21A-5 Grease the Turntable Rotation Bearing and Worm Drive Gear .................... 21A-6 Replace the Drive Hub Oil ............................................................................. 22
PreviousNext |