3 - Description32PlatformTo get access to the platform:• Pull the step(s) up and swing the step(s) (H) out until it clicking intolocked out-position. Retract by pulling up and swing step(s) backto locked in-position.ComponentsA. Main tank lid.B. Pressure gauge and EasyClean clogging indicator.C. Main tank drain valve.D. Clean water tank lid.E. Hand brake.F. Pressure regulation valve.G. Agitation valve.H. Step(s).Right Side CoverThe right side cover is opened by turning the handle in the lower rearcorner of the cover and lifting the cover up.Main components:A. Work and road lights box.B. JobCom box.C. Clean water tank.The clean water tank is integrated in the side cover. It is filled fromthe platform, when the side cover is closed.μ ATTENTION! Only open the right side cover, when the clean watertank (optional) is empty!Tank Level IndicatorThe actual tank level in the main tank can be observed on the tank levelindicator. The scale is displayed in litres.μ ATTENTION! The level indicator is only a guidance for the tanklevel.The total deviation of accuracy for the level is 7.5% for a 20% filledtank and below. For above 20% filled tank, the total deviation ofaccuracy is 5%.Just behind the main tank scale, a level for the rinsing tank is fitted to theframe. This is a guidance to see if the rinsing tank is full or empty. If theguidance ball is at the top, the rinsing tank is full.