component while the server is running. (Orange can also indicate touch points onhot-swap components.) See the instructions for removing or installing a specifichot-swap component for any additional procedures that you might have toperform before you remove or install the component.v When you are finished working on the server, reinstall all safety shields, guards,labels, and ground wires.v For a list of supported optional devices for the server, see http://www.ibm.com/servers/eserver/serverproven/compat/us/.System reliability guidelinesTo help ensure proper cooling and system reliability, make sure that the followingrequirements are met:v Each of the drive bays has a drive or a filler panel and electromagneticcompatibility (EMC) shield installed in it.v If the server has redundant power, each of the power-supply bays has a powersupply installed in it.v There is adequate space around the server to allow the server cooling system towork properly. Leave approximately 50 mm (2.0 in.) of open space around thefront and rear of the server. Do not place objects in front of the fans. For propercooling and airflow, replace the server cover before turning on the server.Operating the server for extended periods of time (more than 30 minutes) withthe server cover removed might damage server components.v You have followed the cabling instructions that come with optional adapters.v You have replaced a failed fan within 48 hours.v You have replaced a hot-swap drive within 2 minutes of removal.Handling static-sensitive devicesAttention: Static electricity can damage the server and other electronic devices.To avoid damage, keep static-sensitive devices in their static-protective packagesuntil you are ready to install them.To reduce the possibility of damage from electrostatic discharge, observe thefollowing precautions:v Limit your movement. Movement can cause static electricity to build up aroundyou.v The use of a grounding system is recommended. For example, wear anelectrostatic-discharge wrist strap, if one is available.v Handle the device carefully, holding it by its edges or its frame.v Do not touch solder joints, pins, or exposed circuitry.v Do not leave the device where others can handle and damage it.v While the device is still in its static-protective package, touch it to an unpaintedmetal surface on the outside of the server for at least 2 seconds. This drainsstatic electricity from the package and from your body.v Remove the device from its package and install it directly into the server withoutsetting down the device. If it is necessary to set down the device, put it back intoits static-protective package. Do not place the device on the server cover or on ametal surface.v Take additional care when you handle devices during cold weather. Heatingreduces indoor humidity and increases static electricity.8 IBM System x3250 Types 4364 and 4365: Installation Guide