7. Press the Remote Supervisor Adapter II SlimLine firmly into the connector andmake sure that all tabs on both mounting brackets secure the adapter in place.Attention: Incomplete insertion might cause damage to the server or theadapter.8. If an adapter is installed in expansion slot 1 on the riser-card assembly, removeit.9. Reinstall the riser-card assembly. Make sure that the riser-card assembly is fullyseated in the riser-card connectors on the system board.See the documentation that comes with the Remote Supervisor Adapter II SlimLinefor information about installing the firmware and configuring the adapter. Create abackup copy of the configuration so that if you have to replace the adapter in thefuture, you can restore the configuration.If you have other devices to install, do so now. Otherwise, go to “Completing theinstallation.”Completing the installationTo complete the installation, complete the following steps:1. Install the cover. See “Installing the cover” for more information.2. Install the server in the rack cabinet. See the Rack Installation Instructions thatcome with the server for detailed information about how to install the server in arack cabinet.Attention:v Install the server only in a rack cabinet that has perforated doors.v Do not leave open space above or below an installed server in your rackcabinet. To help prevent damage to server components, always install a fillerpanel to cover the open space and to help ensure proper air circulation. Seethe documentation that comes with the rack cabinet for more information.3. Connect the cables and power cords. See “Connecting the cables” on page 19for more information.4. Update the server configuration. See “Updating the server configuration” onpage 19 for more information.Installing the coverTo install the cover, place it into position and slide it forward.18 IBM System x3250 Types 4364 and 4365: Installation Guide