Service Manual ALS/XLS 20x/256/27203/2019 | 03 66 Installation and DeinstallationINSTALLING OPTIONSConnecting / mounting the externaloperator panelConnecting to a standard machineThe external operator panel is necessary, if the labelleris installed at an inaccessible place.The cable installed to the operator panel is 2.5 m long.External and built-in operator panel can be used alter-nately. Connect the external operator panel to the mini-DINconnection [71A].Connecting to a machine with splash guardThe operator panel cable is led into the cover box bymeans of a split cable gland.Prerequisite:– ALS/XLS 20x with splash guard– Split cable gland (comes with the machine resp. iscontained in the cable gland kit A107182)Together with the split cable gland come twocabe inserts for two different diameter ranges(3-4 mm, 5-6 mm). Use the insert with the wideropening. The inserts are split at one side.Tool:– Open-ended spanner SW 26Procedure: Remove the cover plate [72A] from the cover box. Turn out the cap [72B] from the cover box. Slightly spread the cable insert [72D] to insert thecable.– Position the cable insert on the cable in a way thatthere is sufficient free cable left inside of the coverbox fo both: connecting the cable and mounting thecover box. Insert the cable insert into the two housing halves[72E].– The slot in the insert must be placed on the sameside as the slot between the two housing halves.CAUTION!If the connection cable is longer than2.5 m, EMC-caused disturbances canoccur. Only use the factory-installed cable. Don´t extend the cable. [70] External operator panel (Article number: A7474)[71] Connection (A) for external operator panel.[72] Feeding the operator panel cable through the cover box.AABCDEEFG