2 Preparation for use2-10 CS655 Pro2.2 Turning on/off the powerThis machine has two power switches: the main power switch and the sub power switch.2 ReminderOnce the main power switch is turned on, be sure not to use it in usual operation.To turn on the power1 Turn on the main power switch.– The main power switch is located inside the machine.Open the front door and left side door to reach it.When the main power switch is turned on, the Power LED onthe control panel will light in red.2 Turn on the sub power switch.– The sub power switch is located at the front of the mainbody.When the sub power switch is turned on, the Power LED willturn green.3 The Wake-up Screen and Machine Status Screen will be displayed in sequence.A few seconds after the Wake-up Screen appears on the touch panel, the Machine Status Screen willbe displayed. It takes approximately 7 minutes for the machine to warm up.? Do you want to set reserve jobs while the machine is warming up?% Touch [COPY] tab to change the Machine Status Screen to the Copy Screen, then check that themessage "Ready to set reserve job" is displayed in the message area.