4OPERATING MANUALVERSION 05/2017 ORDER NUMBER DOC 2354920 SPRINT XE6 COMMISSIONING 296.1 Training of Assembly/Commissioning Staff 296.2 Storage Conditions 296.3 Installation Conditions 296.4 Assembling the Manual System 306.4.1 Assembling the Equipment Trolley 306.4.2 Assembling the Control Unit 306.5 Connecting the Manual Powder System 316.5.1 Connection Requirements 316.5.2 Connecting the Airfluid Manual Powder System 326.5.3 Connecting the 60 L Tank Manual System 346.6 Grounding 366.6.1 Grounding the Powder Coating System 366.7 Safety Checks 377 OPERATION 387.1 Training the Operating Staff 387.2 Work 387.2.1 Switching on the Manual System 397.2.2 Adjusting the Fluidization (Airfluid) 407.2.3 Adjusting Fluidization (60 L Tank Without Vibrator Table) 417.3 Factory Setting Recipe Nos. 1–4 427.4 Interrupting the Coating Process 437.4.1 Airfluid Version 437.4.2 60 L Tank Version 447.5 Performing a Paint Change 457.5.1 Airfluid Version 457.5.2 60 L Tank Version 467.6 "Double Click" Recipe (High Dynamic Remote) 498 CLEANING AND MAINTENANCE 508.1 Cleaning 508.1.1 Cleaning Staff 508.1.2 Flushing and Cleaning the System 508.2 Maintenance 508.2.1 Maintenance Staff 508.2.2 Maintenance Instructions 508.2.3 Safety Checks 518.2.4 Maintenance Procedures 518.3 Periodic Checking of the Manual System 528.3.1 Airfluid Version 528.3.2 60 L Tank Version 539 TROUBLESHOOTING AND RECTIFICATION 5410 INSPECTIONS 5611 DISASSEMBLY AND DISPOSAL 5711.1 Disassembly 5711.2 Disposal 5712 ACCESSORIES 5812.1 Feed System SN-2 550/10 5812.2 Maintenance Unit 5812.3 Quick Coupling Set 59