3Com VCX V7122 SIP VoIP Gateway User Manual 25C HAPTER 3: INSTALLING THE VCX V7122This section describes the hardware installation procedures for the VCX V7122. Forinformation on how to start using the gateway, see Chapter 4: Getting Started on page 35.For detailed information on the VCX V7122 connectors, LEDs and buttons, see Chapter 2:VCX V7122 SIP Physical Description on page 19.CAUTION Electrical Shock: The equipment must only be installed or serviced byqualified service personnel.To install the VCX V7122, follow these steps:1 Unpack the VCX V7122 (see Unpacking below).2 Check the package contents (see Package Contents on page 26).3 Mount the VCX V7122 (see Mounting the VCX V7122 on page 26).4 Cable the VCX V7122 (see Cabling the VCX V7122 on page 28).After powering-up the VCX V7122, the Ready and LAN LEDs on the front panel turn to green(after a self-testing period of about 3 minutes). Any malfunction changes the Ready LED tored (see TP-1610 Front Panel LED Indicators on page 22 for details on the VCX V7122LEDs).When you have completed the above relevant sections you are then ready to startconfiguring the gateway (see Chapter 4: Getting Started on page 35).UnpackingCAUTION Electrical Component Sensitivity: Electronic components on printedcircuit boards are extremely sensitive to static electricity. Normal amounts of staticelectricity generated by clothing can damage electronic equipment. To reduce therisk of damage due to electrostatic discharge when installing or servicing electronicequipment, it is recommended that anti-static grounding straps and mats be used.To unpack the VCX V7122, follow these steps:1 Open the carton and remove packing materials.2 Remove the VCX V7122 gateway from the carton.3 Check that there is no equipment damage.4 Check, retain and process any documents.5 Notify 3Com or your local supplier of any damage or discrepancies.6 Retain any diskettes or CDs.