3. Installation process3. INSTALLATION PROCESSAbout the installation processThe installation of the complete system is split up in two parts, installation of the projector and the installation of the cooler unit astop pack or stand alone pack.Overview• Installation process projector• Installation process top cooler• Installation process stand alone cooler• Software upgrade• Starting up and adjusting the system3.1 Installation process projectorInstallation process from A to Z1. Check if all installation requirements are fulfilled such as the environment conditions of the installation area, electrical facili-ties, etc. Note that a solid pedestal is required to support the projector. For more info see topic installation requirements.2. Physical installation of the projector upon its pedestal.3. Electrical connection with the power net. Depending the projector type, see chapter "Connecting the DPxK-17/23BLP withthe power net", page 31 or chapter "Connecting the DPxK-36BLP with the power net", page 32.4. Installation of the lens. First select a lens with appropriate throw ratio covering the screen size and the projector - screendistance. Then install the lens in the lens holder of the projector. For more information about available lenses, lens selection andlens installation see chapter "Lenses & lens holder", page 63.Caution: The projector is delivered with a plastic cover inside the Lens Holder. Remove the cover prior to installing the lens.5. Installation of the ICMP, IMB, IMS or HDSDI input module. (only in case no ICMP, or IMB or IMS or HDSDI is factory installed).6. Installation of the HDDs. In case the HDDs of the ICMP are delivered separated from the projector remove the protection tapefrom the HDD input slots and install all three HDDs as described in the procedure "Installing a HDD into the ICMP", page 111.Make sure that all HDDs in the ICMP HDD set have the same storage capacity. See label on top of the HDD to know the storagecapacity.7. Installation of the Cooler. In case of a top pack installation, see "Installation process top cooler", page 23. In case of a standalone combination, see "Installation process stand alone cooler", page 24.8. (Option) Installation of the optional Communicator touch panel on the projector. In both stand alone and top pack solutions, itis possible to install a Barco communicator touch panel. Note: If the customer chose the top pack solution it is recommended toinstall the top cooler first, then the touch panel.9. Upgrade all software to the latest available version. See "Software upgrade", page 24.10.Start up your projector and adjust the system. See "Starting up and adjusting the system", page 24.3.2 Installation process top coolerInstallation process from A to Z1. Assembling of the cooling box housing. The housing is delivered as a flat pack and should be pre-assembled during theinstallation process.2. Mounting of the cooler housing on its support (frame).3. Mounting of the Front support on the cooler frame.4. Mounting the empty cooler assembly on the projector.5. Insert the cooler units and filters.6. Establish the hose connections (4x) between the cooler and the projector. Connect also the four cables.7. If desired, mount the Communicator touch panel on the support foot of the cooler support and make the connections with theprojector.R5906753 DPXK BLP SERIES 20/11/2017 23