Eaton 93PM Integrated Battery Cabinet-Small (IBC-S) Installation Manual 164000305—Rev 06 25Figure 9. Removing the Pallet Skids and Supports – Eaton 93PM Integrated Battery Cabinet-SmallRear CabinetSupportCabinetSupport Bolts(2 Places ateach corner)Left SideCabinetSupportRight SideCabinet SupportPallet SkidCabinetMounting Bolts(4 place front)(4 places rear)Front CabinetSupportSkid Mounting Bolts(4 places front)(4 places rear)Jacking Bolts(2 places front)(2 places rear)Floor Protectors(2 places front)(2 places rear)10. Remove the cabinet support bolts fastening the front, rear, and side cabinet supports together and removethe side supports (see Figure 9).11. Remove the cabinet mounting bolts holding the front and rear supports to the cabinet base and removethe supports (see Figure 9).12. If installing the cabinet permanently, retain the cabinet mounting bolts; otherwise, recycle the bolts alongwith the support brackets in a responsible manner.13. Close the door and secure the latch.14. If the leveling feet are not retracted, turn all four leveling feet until they are retracted as far into the cabinetas possible.NOTE The battery cabinet may be located to either the right or left of the UPS cabinet. Therecommended location is to the right of the UPS cabinet. This procedure assumes thebattery cabinet is located to the right of the UPS cabinet.15. If line-up-and-match installation, remove the rectangular and circular knockout on the bottom and top frontside of the UPS and the IBC (see Figure 10).16. The IBC is shipped set up for rear ventilation with a cover plate installed over the ventilation grill on top ofthe unit (see Figure 11). If top ventilation is required, remove the screws securing the plate at the top ofthe unit and install the plate over the rear ventilation grill (see Figure 12).Installation