Eaton 93PM Integrated Battery Cabinet-Small (IBC-S) Installation Manual 164000305—Rev 06 vLLiisstt ooff FFiigguurreessFigure 1. Eaton 93PM Integrated Battery Cabinet-Small ...................................................................................... 1Figure 2. Eaton 93PM 50 kW or 100 kW UPS and Two 93PM Integrated Battery Cabinets ......................................... 2Figure 3. Integrated Battery Cabinet-Small Dimensions (Front and Right Side Views) .............................................. 13Figure 4. Integrated Battery Cabinet-Small Dimensions (Top and Bottom Views) .................................................... 14Figure 5. Integrated Battery Cabinet-Small Floor Mount Bracket Dimensions......................................................... 15Figure 6. Integrated Battery Cabinet-Small Center of Gravity .............................................................................. 16Figure 7. Eaton 93PM IBC-S as Shipped on Pallet ............................................................................................ 21Figure 8. Eaton 93PM Integrated Battery Cabinet-Small Battery Breaker Locations ................................................. 22Figure 9. Removing the Pallet Skids and Supports – Eaton 93PM Integrated Battery Cabinet-Small ............................ 25Figure 10. Line-Up-and-Match Wiring Access Locations...................................................................................... 27Figure 11. Rear Ventilation ........................................................................................................................... 28Figure 12. Top Ventilation............................................................................................................................. 28Figure 13. Wiring Channel Location ................................................................................................................ 30Figure 14. DC Power Terminal Locations – Eaton 93PM Integrated Battery Cabinet-Small.......................................... 31Figure 15. Wire Tie Anchors ......................................................................................................................... 32Figure 16. DC Power Terminal Detail – Eaton 93PM Integrated Battery Cabinet-Small............................................... 33Figure 17. IBC-S Top and Bottom Entry Conduit and Wire Entry Locations .............................................................. 35Figure 18. Interface Terminal Locations – Eaton 93PM Integrated Battery Cabinet-Small ........................................... 38Figure 19. Shunt Trip, Battery Detect, and Thermal Sensor Wiring ........................................................................ 39Figure 20. Interface Terminal Detail – Eaton 93PM Integrated Battery Cabinet-Small ................................................ 40Figure 21. 93PM Integrated Battery Cabinet Line-Up-and-Match Power Oneline ...................................................... 47Figure 22. 93PM Integrated Battery Cabinet Standalone Power Online – One or Two Cabinets ................................... 48Figure 23. 93PM Integrated Battery Cabinet Standalone Power Online – Three or Four Cabinets ................................. 48Figure 24. 93PM Integrated Battery Cabinet Interface Oneline ............................................................................. 49Figure 25. 93PM Integrated Battery Cabinet Schematic...................................................................................... 50Figure 26. 93PM Integrated Battery Cabinet Battery String Detail Schematic .......................................................... 51