5-106 C70 Capacitor Bank Protection and Control System GE Multilin5.4 SYSTEM SETUP 5 SETTINGS5Figure 5–26: DUAL BREAKER CONTROL SCHEME LOGIC (Sheet 1 of 2)IEC 61850 functionality is permitted when the C70 is in “Programmed” mode and not in the local control mode.USER 3 OFF/ONTo open BRK1-(Name)D60, L60, and L90 devices from trip outputC60, D60, L60, and L90 relays from recloserANDANDORANDORORANDANDORANDANDANDANDANDSETTING= EnabledBREAKER 1 FUNCTIONSETTINGOff = 0BREAKER 1 BLOCK OPENFLEXLOGIC OPERANDSTRIP PHASE ATRIP PHASE BTRIP PHASE CTRIP 3-POLESETTINGOff = 0BREAKER 1 OPENSETTING= EnabledBREAKER 1 PUSHBUTTONCONTROLUSER 2 OFF/ONTo close BRK1-(Name)SETTINGOff = 0BREAKER 1 CLOSEFLEXLOGIC OPERANDAR CLOSE BKR 1SETTINGOff = 0BREAKER 1 BLOCK CLOSESETTINGMANUAL CLOSE RECAL1 TIME0FLEXLOGIC OPERANDBREAKER 1 MNL CLSFLEXLOGIC OPERANDBREAKER 1 ON CMDFLEXLOGIC OPERANDSBREAKER 1 OFF CMDBREAKER 1 TRIP ABREAKER 1 TRIP BBREAKER 1 TRIP CTo breaker control logic sheet 2 859711A2.CDRBrkCSWI1.PosOpn.ctValBrkXCBR1.BlkOpn.ctlVal ANDORORORORBrkXCBR1.BlkOpn.stValANDANDOR 020 msBrkCSWI1.PosCls.ctValANDSETTINGOff = 0XCBR1 ST.LOC OPERAND:ORANDORBrkCBR1.BlkCls.ctValBrkXCBR1.BlkCls.stVal61850 model61850 model61850 model61850 XCBR config setting61850 model 61850 model61850 modelORBrkXCBR1.PosOpn.ctValBrkXCBR1.PosCls.ctVal ORNOTE