Mounting HLR Mounting Instruction20 192-510201N1 HLR 2019-04In this chapter you can read about:General installation instructions ....................................................................................... 20Installation of a single axis ............................................................................................... 21Mounting Method of a double axis ................................................................................... 22Correct position of loads on the carriage. ......................................................................... 26Installation / dismantelling of the drive ............................................................................. 27Assembly of Z-axes ......................................................................................................... 28Assembly of accessories ................................................................................................. 343.1 General installation instructionsBefore carrying out any installation work make sure that carriage cannot move.Therefore, de-energize the respective drive and mechanically secure thecarriage.Before carrying out any installation work de-energize the motor. Danger ofelectrical voltage. Improper wiring may lead to severe injuries or death. A wiringmust always be made from a skilled electrician. Observe the safety instructions ofthe motor used.Always ensure that the carriage is secured against slipping, especially when thelinear actuator is mounted vertically! For this purpose, push the carriage slowly byhand to the (later) lower position against the internal end stop, even before thevertical position is reached.Depending on the operating conditions (rotation speed, load, etc.) increasedsurface temperature in the area of the drive may occur. When touching it duringoperation slight injuries from burning may occur. Don't touch the product duringoperation.When installing the HLR linear axes in your system, make sure that the deflectionstations and the carriage are accessible for maintenance purposes! Providesufficient space to lubricate the carriage and the deflection stations regularly, toreplace the wear parts and, if necessary, to tighten or replace the toothed beltand, if necessary, to open or replace the steel strip cover.Before installation, check the supplied linear actuator for compliance with theorder confirmation, see order code on the type plate of the linear axis (completespecification of the actuator).We recommend to secure the screws with a liquid bolt retaining compound (e.g.Loctite242)3. Mounting