Assembly Instructions21Deck Discharge Chute Installation(GHS Rear Discharge Models Only)Mount the discharge chute hinge on top of the deckdischarge opening using the 1/4-20 x 1/2 in. socketbutton head screw and 1/4-20 ESNA nut. Positionthe screw with the head inside of the chute and thenut on the outside. Attach spring for tilt-up actionfrom chute to bracket on deck.AttachChuteAttach GuardNut on TopCarrier Frame Tube SocketsDischarge Chute and PTO Shaft GuardInstallation on Rear Discharge DeckDeck Discharge Deflector Shield Installation(Side Discharge Models Only)Attach the side discharge deflector shield using two(2) 3/8-16 x 1-1/4 in. bolts, 3/8-16 nylock insert lock-nuts, and 3/8 in. wave spring washers. The wavewashers fit between the two hinging surfaces. Tight-en the nuts until the shield moves freely but is notloose.WARNINGDO NOT operate the machine without thegrass deflector shield attached and in thelowest possible position.Attach ShieldDischarge Shield Installationon Side Discharge DeckPTO Shaft Guard InstallationPosition the shaft guard as shown and mount withtwo (2) 1/4-20 x 1/2 in. bolts.Tilt-Up Roller Wheel InstallationMount the two (2) tilt-up roller wheels on the brack-ets on the rear skirt of the deck housing using theP/N 8490 axle bolt, 3/8 in. wave spring washer and3/8-16 in. Whiz locknut. Tighten the axle bolt untilthe wheel rolls freely, but is not loose.Attach SpringRoller WheelsTilt-Up Spring and Roller WheelInstallation on Rear Discharge Deck