12 YASKAWA TOEP YEACOM 06A V1000 Option PROFINET SI-EP3/V Installation Manual4 Option Components4 Option Components◆ SI-EP3/V PROFINET OptionFigure 1Figure 1 Top Views of OptionA – LED (MS) <1> K – Port 2 LED (10/100) <1>B – LED (NS) <1> L – Port 2C – Option cover M – Port 2 LED (LINK/ACT) <1><1> Refer to Option LED Display on page 14 for details on the LEDs.<2> Ground wires are packaged loose inside the option packaging and must be connected during installation.D – PROFINET PCB N – Port 1 LED (10/100) <1>E – Screw hole (attaching option cover) O – Port 1F – Nameplate P – Port 1 LED (LINK ACT) <1>G – Functional Earth cable connection (FE) Q – PROFINET cable connectionH – Mounting tabs R – Option connector (CN5)I – Ground wire <2> S – Option Firmware Label(VST)J – Pass-through hole for ground wireABCHEDHGIJRFQ00000000000000SI-EP3/V 1XXXP N KMO LSOption with cover removedCN5 connector portOption with cover attached Option Underside