2 Installation2.2.11. Inspection, DressPack upper arm3HAC027309-001 Revision: D92© Copyright 2006-2010 ABB. All rights reserved.2.2.11. Inspection, DressPack upper armGeneralIn order to ensure adequate life of the equipment, it is vital that the cables and hoses areproperly installed and operated correctly, with their movement patterns well within theacceptable limits.This procedure below details how to inspect the DressPack upper arm installation in thisregard.Procedure, generalAttachments and bracketsThis section details each inspection to be carried out, not necessarily in any particular orderunless stated.NOTE!This procedure is not applicable to cable package IRBDP MH3 UE.Action Note1. Inspect all attachments, brackets and anyother hardware securing or guiding theprotective hose.Detailed in section Attachments andbrackets on page 92.2. Inspect the process cable package. Detailed in section Cables and hoses onpage 93.3. Make sure all cables and hoses are securelyfixed and connected.Detailed in section Securing andconnecting on page 94.Action Note1. Make sure the sliding surfaces of theslide sleeve has not been damaged.Check this with normal hand force:• grab hold of the package• pull and turn to make sure thatthe package is free to slide.NOTE!A damaged surface may potentiallyprevent the cable package from rotatingcausing excessive wear.xx0600003176• A: Slide sleeve, slide surface• B: Hose reinforcement• C: Process cable support, axis 6Continues on next page