Chapter 9: Managing Tasks ● 114Modifying a TaskIf your requirements change, you can reschedule a task to a different date or time. You can alsomodify the task description that appears in the Task List. Creating a custom task descriptionmakes it easier to find the task in the Task List.To modify a scheduled task:1 In the tool bar, click Configure, select the system you want, then click Tasks (as shown onpage 112).2 In the Task Manager, select the task you want to change, then click Modify task.3 In the Modify Task window, make the required changes, then click OK.The task and Task List are updated with the new information.What if a task misses its start time?Tasks scheduled in Adaptec Storage Manager include an automatic 30-minute grace periodfollowing their start time, to accommodate temporary interruptions. For instance, if there’s abrief power outage a task will run once normal conditions resume, if the interruption lasts nolonger than 30 minutes past the scheduled start time.If a task misses its start time, it must be rescheduled. For instructions, see Modifying a Task.If a recurring task misses its start time, it is automatically rescheduled to run at the nextscheduled interval.