SiBE31-801_C Field SettingTest Operation 186Image of operation in the case of AImage of operation in the case of BImage of operation in the case of A and BPower consumptionRated power consumption80 % of rated power consumption70 % of rated power consumption60 % of rated power consumption40 % of rated power consumptionForced thermostat OFF(Fan operation)Demand level 1 instructing Demand level 2 instructing Demand level 3 instructingPower consumption set by"Demand 1 level setting".The powerconsumption duringthe demand level 1instructing can beset with the"Demand 1 levelsetting".("70 % of ratedpower consumption"has been set atfactory.)Power consumptionRated power consumption80 % of rated power consumption70 % of rated power consumption60 % of rated power consumptionThe power consumption set with "Demand 1 level setting".When the "Normaldemand setting" isset to ON ("OFF"has been set atfactory.) , the powerconsumption can beset with the"Demand 1 levelsetting". ("70 % ofrated powerconsumption" hasbeen set at factory.)Power consumptionRated power consumption80 % of rated power consumption70 % of rated power consumption60 % of rated power consumption40 % of rated power consumptionForced thermostat OFF(Fan operation)The power consumption set with "Demand 1 level setting". ★Demand level 2 instructing ★Demand level 3 instructing★During continuous demand operation,when the external demand instruction isreceived repeatedly, the instruction withhigher demand level has the precedence.The powerconsumption can beset with the"Demand 1 levelsetting". ("70 % ofrated powerconsumption" hasbeen set at factory.)