NOTICEThe pedestal is packaged separately and included in theshipment. Mount the frequency converter on thepedestal in its final location. The pedestal allows properairflow and cooling to the frequency converter. Seechapter 5.1.3 Pedestal Installation of F-frames.5.2.5 Tools NeededTo perform the mechanical installation, the followingtools are needed:• Drill with 10 mm or 12 mm drill bits.• Tape measurer.• Wrench with relevant metric sockets (7–17 mm).• Wrench extensions.• Sheet metal punch for conduits or cable glandsin IP21 (NEMA 1) and IP54 (NEMA 12) units.• Lifting bar to lift the unit (rod or tube max. Ø 25mm (1 inch), able to lift minimum 400 kg (880lbs)).• Crane or other lifting aid to place the frequencyconverter in position.• Use a Torx T50 tool to install the E1 in IP21 andIP54 enclosure types.5.2.6 General ConsiderationsWire AccessEnsure that proper cable access is present includingnecessary bending allowance. As the IP00 enclosure isopen to the bottom, cables must be fixed to the backpanel of the enclosure where the frequency converter ismounted.NOTICEAll cable lugs/shoes must mount within the width of theterminal bus bar.SpaceEnsure proper space above and below the frequencyconverter to allow airflow and cable access. In addition,space in front of the unit must be considered to enableopening of the door of the panel.105298[11.7]404[15.9]130BC519.10Illustration 5.11 Front Clearance of IP21/IP54 Enclosure Type,Frame Size D1h, D5h, and D6h130BC520.10105523[20.6]395[15.6]Illustration 5.12 Front Clearance of IP21/IP54 Enclosure Type,Frame Size D2h, D7h, and D8h748(29.5)579(22.8)176FA276.12≤105,0°Illustration 5.13 Front Clearance of IP21/IP54 Enclosure Type,Frame Size E1.How to Install Design GuideMG20Z202 Danfoss A/S © Rev. 06/2014 All rights reserved. 815 5