UPS System InstallationEaton 93PM UPS (20–100 kW, 480V – 100 kW Frame) Installation and Operation Manual P-164000227—Rev 6 www.eaton.com/powerquality 4-3Figure 4-2. Removing the Sidecar Pallet Skids and Supports – Eaton 93PM UPS6. Turn each jacking bolt consecutively, two full turns, until the pallet skids clear the floor by approximately3 mm (1/8").7. Remove the hardware loosened in Step 4.8. If a sidecar is attached to the UPS, remove the hardware loosened in Step 5.9. Pull the pallet skids out from under the metal angle supports without disturbing the jacking bolts. Recyclethe pallet skids and hardware in a responsible manner.CAUTIONCABINET MAY FALL. Do not loosen the hardware attaching the front supports to the cabinet base.The cabinet must be lowered by the jacking bolts before the supports can be removed.10. Carefully and evenly lower the cabinet by turning each jacking bolt consecutively two full turns(maximum) until the casters contact the floor and the cabinet is no longer supported by the jacking bolts.11. After the UPS is resting on the floor, remove the jacking bolts and floor protectors. Recycle them in aresponsible manner.12. Remove the cabinet support bolts fastening the front, rear, and side cabinet supports together andremove the side supports (see Figure 4-1).13. If a sidecar is attached to the UPS, remove the bottom screw securing the sidecar front panel. Lift thepanel straight up to remove from the panel hanger brackets at the top of the cabinet.SidecarMounting Bolts(2 places front)(2 places rear)SidecarPallet SkidSidecar SkidMounting Bolts(2 places front)(2 places rear)Sidecar RearCabinet SupportSidecar FrontCabinet Support