19EnglishCheck that the links are correctly fitted and that theterminal screws are tight. Secure the mains cable usingthe cable clamp.Current Operated Earth Leakage BreakersWhere the installation is protected by a 30-milliampsensitivity residual current device (RCD), the combineduse of your cooker and other domestic appliances mayoccasionally cause nuisance tripping. In these instancesthe cooker circuit may need to be protected by fittinga 100mA device. This work should be carried out by aqualified electrician.Refit the doorsRefit all the oven doors to the cooker.HotplateCheck each burner in turn. There is a fl ame safetydevice that stops the fl ow of gas to the burner if thefl ame goes out. There is also a spark ignition systemthat works when the knob is pressed in.For each burner, push in and turn the knob to the largefl ame symbol ( ).The igniter should spark and light the gas. Keep holdingthe knob pressed in to let the gas through to the burnerfor few seconds.If, when you let go of the control knob, the burner goesout, the safety device has not held in. Turn the control tothe off position and wait one minute, then try again thistime holding in the control knob for slightly longer.GrillOpen the grill compartment door. Turn on the grill controland check that the grill heats up.Oven checkTurn on the ovens and check that they start to heat up.Turn off the ovens.Fitting the plinthRemove the 2 screws along the front bottom edge of thecooker. Hold the plinth in place and refit the 2 screws.Customer carePlease inform the user how to operate the cooker andhand over these instructions.Thank you.