Chapter 2. Installation4 TransPort ® PT900 User’s Manual2.2 Unpacking the PT900 SystemBefore removing the PT900 system from its carrying case (see the optional hardshell carrying case in Figure 2 on page 5), inspect the contents of the case carefully.Before discarding any of the packing materials, account for all components anddocumentation listed on the packing slip. If anything is missing or damaged,contact GE Customer Care immediately for assistance.Because the PT900 system may be ordered in many different configurations, thefollowing packing list is shown only as a typical example:In addition to the standard components, the following optional components areavailable for use with the PT900 system:• Energy kit with an RTD module and an RTD cable for connection to thePT900 transmitter• An AIO cable with cabling box• A DIO cable with cabling box• A battery charger• A transducer extension cable up to 100 ft long• A 48" chain for the clamp-on fixture1. Transducers (2) 9. PT900 Power Supply2. Clamping Fixture 10. OD Tape3. Transducer Cables 11. Couplant4. Transmitter 12. PT900 Mounting Strap w/Magnet5. Tablet 13. Temperature Transmitter6. Tablet Power Cord 14. Thickness Gauge7. SD Card 15. Documentation8. Case