OfficeServ 7400 INSTALLATIONTECHNICAL MANUAL PART 1 JANUARY 20117 CONNECTING STATIONS AND ADDITIONAL EQUIPMENT7.1 CONNECTING STATIONS .................................................................................... 7.17.2 CONNECTING ADDITIONAL EQUIPMENT ................................................... 7.328 POWER UP PROCEDURES8.1 PRE-CHECK .............................................................................................................. 8.18.2 STARTING THE SYSTEM ....................................................................................... 8.18.3 CHECKING THE FAN ............................................................................................. 8.28.4 NUMBERING EXTENSIONS AND C.O. LINES .................................................. 8.39 SOFTWARE AND DATABASE MANAGEMENT.9.1 SOFTWARE MANAGEMENT ............................................................................... 9.19.2 DATABASE MANAGEMENT ................................................................................ 9.110 ADDING BOARDS TO THE SYSTEM10.1 ADDING STATION AND TRUNKS....................................................................... 10.1FIGURESFigure 2.1 Tools Required for Rack InstallationFigure 2.2 Rack Installation (1)Figure 2.3 Rack Installation (2)Figure 2.4 Rack Installation (3)Figure 2.5 Rack Installation (4)Figure 2.6 GroundingFigure 3.1 Front Panel ConfigurationFigure 3.2 Possible Combination of OS7200 and OS7400Figure 3.3 Back Panel ComponentsFigure 3.4 Switch SettingsFigure 3.5 Installing the Processor Board (1)Figure 3.6 Installing the Processor Board (2)Figure 3.7 LP40 Link CableFigure 3.8 Connecting MP40 Board to LP40 BoardFigure 3.9 Connecting MP40 to OS7200 LCPFigure 3.10 Front View of the MP40Figure 3.11 Front View of the LP40Figure 3.12 Installing Optional Daughtercards on the LP40Figure 3.13 Installing Optional Modem Daughtercards on the MP40