CHAPTER 3Configuring the Gateway108• Job scheduling - allows to define a time schedule (“Mode”) towhich time the A850 has to perform a SSH tunneling;• Job status - for information at which time the last SSHtunneling has been performed and with which success, as wellas at which time the next SSH tunnelling is planned;• Job dependent settings - allow to arrange that a message willbe forwarded to the address entered in the tree window“Notification Sending” in case of successful SSH tunneling;• Primary Server - allows to assess the access data for theprimary SSH tunnel server;• Secondary Server - allows to assess the access data for thesecondary SSH tunnel server.Job schedulingFigure 102. SSH Tunnel - Job schedulingWithin “Job scheduling”, the pull down menu “Mode” providesthe following set-ups to start a SSH tunneling:Note: The job scheduling layed down can be oversteered by thecommands ”Start Job” or “Stop Job” according to Fig. 43or 46, respectively.