CHAPTER 3Configuring the Gateway110Figure 105. SSH Tunnel - Job scheduling - Mode - TimesJob status“Job status” allows you to check the time and the result of the lastSSH tunnel connection:Figure 106. SSH Tunnel - Job status• Last run - displays the point in time when the last contact withthe SSH tunnel server took place;• Last result - displays the result of the establishment of thecontact;• Next run - displays the point in time of the planned nextestablishment of contact with the SSH tunnel server.Job dependent settingsDetermine that in case of successful connection to the SSH tunnelserver, a message has to be forwarded to the address enlisted inthe tree window “Notification Sending”.