COPYRIGHT © 2001 CANON INC. 2000 2000 2000 2000 CANON iR105 REV.0 JULY 2001CHAPTER 4 INSTALLATION4-42 Unpacking and Installation2.1 Points to Note Before Starting the WorkGo through the following before starting to install the machine:1. If the machine is moved from a cold to warm place, it can develop con-densation in the form of droplets of water on its metal surfaces.Use of the machine while it suffers from condensation can lead to imagefaults. If the machine has been moved from a cold to warm place, be sureto leave it for 1 hour or more without unpacking so that it becomes fullyused to the new place.2. If stairs are used to move the machine into or out of the site of installa-tion, keep the following in mind:a. Take out the ADF, fixing/feeding assembly, holding tray assembly, andcopy paper, and carry them separately from the main body.b. When lifting the machine, do not use the grips on the pickup assembly/delivery assembly. Instead, be sure to support the machine at four cor-ners of its bottom.3. Shift up the 2 adjusters (front) found on the bottom of the machine to besure that they are unlocked. The adjusters can slip out of the bottom ofthe machine because of vibration during transportation. Take care not toloose them.4. Be sure to work as a group of three or more. When removing the pad, inparticular, one must hold the rear grip and one the front grip, while theother removes the pad.5. Be sure to remove the accessories (side paper deck, finisher, paper fold-ing unit) when moving the machine into or out of the site of installationto prevent damage.