Chapter 22-32.1.3 Before Starting the Work (230V EUR) 0012-6997iR2016i / iR2020i1-1 Points to Make Before InstallationBe sure to go through the following before starting the work:1) If you are installing the machine after moving it from a cold to warm location, be sure to leave the machine unpacked for at least 2 hours so that the machine isfully used to the site temperature, thus avoiding image faults caused by condensation. (The term "condensation" refers to the formation of droplets of water onthe surface of a metal object brought in from a cold to warm place, i.e., as the result of the rapid cooling of the moisture (vapor) around the object.)2) The machine weighs a maximum of about 52 kg. Be sure to work in a group of 2 persons when lifting it.1-2 Checking the ContentsCheck to be sure that none of the following contents is missing:F-2-5*1: iR2020i: 2 pc., iR2016i: 1 pc.Check the documentation and CD against the following table:1-3 Names of Parts[1] Drum unit ---1 [6] Document size label ---1[2] Power cable ---1 [7] Finger pinch caution label ---1[3] Ferrite core ---1 [8] Scan glass cleaning label ---1[4] Cassette size label ---2(1) (*1) [9] Black streak cleaning instruction label ---1[5] Caution sheet ---2(1) (*1)Operators manual: User's GuideOperators manual: Network Quick Start GuideDrum Unit Replacing GuideOperators manual CD-ROMDriver/Utility CD-ROM (UFR)Driver/Utility CD-ROM (PCL)[1] [2][5]Bitte stellen Sie den Hebel zumErkennen des Papierformats aufdas neue Format ein.Set the size detector lever to thenew paper size.Placer I’indicateur de format surle nouveau format.FU5-xxxxBitte stellen Sie den Hebel zumErkennen des Papierformats aufdas neue Format ein.Set the size detector lever to thenew paper size.Placer I’indicateur de format surle nouveau format.FU5-xxxxA4A3 B5 STMT/LGLB4 LTRLTR11 17 16K8K A5A4 B5 A5A4/A3 B5/B4 A5A4 B5 A5A4A3 STMT/LGLLTRLTR11 17 A5/A4 A5A5/A4A4/A3 A5[6][7] [8] [9]A3A5B58KLTRA4B511 17STMTA4B416KLTRLGL[4][3]