M6 16 Pan-HeadScrews (4 places)M6 Cage Nuts(4 places)InstallationEaton 9130 700/3000 VA UPS User’s Guide 164201718—Rev 7 www.eaton.com/powerquality 16Figure 7. Securing the Front of the Cabinet13. Optional. Insert a rear stop bracket through the inside of each rail behind the UPS. Rotate each bracketand slide the bracket until it fits tightly against the UPS's rear panel. Secure each bracket to the UPS withone M3x8 pan-head screw. See Figure 8.Repeat for any optional cabinets.14. Continue to the following section, “Rackmount Wiring Installation.”3MtekcarBpotSraeR 8 Pan-Head ScrewFigure 8. Securing the Back of the Cabinet (Optional)Rackmount Wiring InstallationThis section explains:l Installing the UPS, including connecting the UPS internal batteriesl Connecting any optional EBMsInstalling the UPSNOTE 1 Do not make unauthorized changes to the UPS; otherwise, damage may occur toyour equipment and void your warranty.NOTE 2 Do not connect the UPS power cord to utility until after installation is completed.To install the UPS:1. Remove the UPS right front cover (behind the LCD control panel). See Figure 9.To remove the cover, remove and retain the two screws on the right side of the cover. Grasp the top andbottom of the cover and slide the cover to the right.