InstallationEaton 9130 700/3000 VA UPS User’s Guide 164201718—Rev 7 www.eaton.com/powerquality 206. Verify that the EBM connections are tight and that adequate bend radius and strain relief exist for eachcable.sledoMAV0003–0002sledoMAV0051otpUFigure 13. Typical EBM Installation7. Replace the EBM front cover.To replace the cover, verify that the EBM cables are routed through the EBM cover knockouts, then slidethe cover from the left to the right until it connects with the cover hook near the left side of the EBMcabinet. Reinstall the two screws on the right side of the front cover. For reference, see Figure 12 onpage 19.Repeat for each additional EBM.8. Verify that all wiring connecting the UPS and EBM(s) is installed behind the front covers and isinaccessible to users.9. Return to Step 4 on page 18 to continue the UPS installation.Tower InstallationThe Eaton 9130 tower cabinet comes fully assembled and ready to connect.CAUTIONThe cabinet is heavy (see page 56). Removing the cabinet from its carton requires a minimum oftwo people.To install the cabinet:1. Place the UPS on a flat, stable surface in its final location.2. If installing additional cabinets, place them next to the UPS in their final location.3. Continue to the following section, “Tower Wiring Installation.”Tower Wiring InstallationThis section explains:l Installing the UPS, including connecting the UPS internal batteriesl Connecting any optional EBMs