Table 14. Ethernet communication card configurationsType CardconfigurationsOutputconnectorsCommunicationspeed1 10/100 Base-T (wired) RJ-45 10/100MBps(auto-switching)2 100 Base-FX (multi-mode fiber) MT-RJ 100MBps(full-duplex)3 100 Base-FX (multi-mode fiber) SC 100MBps(full-duplex)4 100 Base-FX (multi-mode fiber) ST 100MBps(full-duplex)5 100 Base-FX, (single-mode fiber) LC 100MBps(full-duplex)Maximum link length is determined by the use of theparticular physical layer implementation, and can be furtherconstrained by the actual network configuration. In case ofthe 100Base-FX MT-RJ connector based implementation,maximum link length in excess of 2000m can be achievedwith 62.5/125μm multi-mode fiber. The fiber-optic link uses1300nm wavelength, and can easily be interfaced to other100Base-FX solutions (ST connector patch cord solution).Table 15 indicates the pin assignments for the Ethernet(wired) communication card accessory (Figure 32).Table 15. Ethernet (RJ-45) communication portpin assignmentsPin number Pin name Pin description1 TX+ Transmit data (positive)2 TX– Transmit data (negative)3 RX+ Receive date (positive)4 NC No connection5 NC No connection6 RX– Receive data (negative)7 NC No connection8 NC No connectionJ2 Connector8 7 6 5 4 3 2 1Figure 32. Ethernet (wired) communication portpin identificationTestingCAuTIONEquipment misoperation. Do not connect this controlto an energized recloser until all control settings havebeen properly programmed and verified. Refer to theprogramming information for this control. Failure tocomply can result in control and recloser misoperation,equipment damage, and personal injury. G110.3IMPORTANTThe Form 4D control can be taken out of service for testingand placed back into service without de-energizing itsrecloser and interrupting the system. However, during thetime the control is out of service, the recloser is inoperative.Testing an installed controlThe following tests to determine initial operation of theForm 4D pole-mount recloser control can be performedwhile connected to an operating recloser.otee:N These are the only tests performed on an installed,operating control.1. Verify operating status of all indicator lights by pressingany key to reactivate the display and active LEDs.2. Check the operational values for currents, voltages, andother metering information.otee:N Scroll through the LCD display messages by pressingthe and cursor movement arrows underneath theLCD display on the programming panel (Figure 33).DATA PORTSENTEREDITESCPHASE FAULTA B CGROUNDFAULTABOVE MIN TRIPLOCKOUTOPENCLOSEDVOLTAGE TRIPFREQUENCY TRIPSENSITIVE GNDA B CX Y ZPHASE VOLTAGEALARMBATTERYAC POWERCONTROL OKALTGND TRIPBLOCKEDNONRECLOSESUPER-VISORYOFFHOT LINETAGTRIP CLOSEFigure 33. LCD display and cursor movement arrows3. View battery information and test battery operationas follows:a. Scroll down the front panel HMI to the BATTERYmenu item and press the ENTER button. Code 081Battery Voltage and Current will be displayed:VBat = XX.XX VoltsIBat = -X.XX Amps36 operation inStrUCtionS MN280049EN September 2017Form 4D Microprocessor-based pole-mount recloser control installation and operation instructions