3 Installation3.2 Instruction leafletsRapid Link 5 · RAMO5 · RASP5 05/20 MN034004EN www.eaton.com 873.2.4 Position of the power connectionsThe standard arrangement of the power connections is vertical and down-wards.Qualified specialists can create a horizontal arrangement by turning the blackenclosure base 90° to the left or right. To do this, remove the four screws in theenclosure cover.Figure 44: Dismantling the enclosure cover▶ Fix the enclosure cover at the side and lift off carefully.TORX 30 IP1